Learn English with English, baby!

Join for FREE!

Social_nav_masthead_logged_in

My Blog

  •  
  • Subscribe to my RSS

September 18, 2011

1, 0745 I went to CCR .

2, 0800 Gas Engineer Mr. Wang and I went to starboard Manifold to set up filter.

3, 0900 I went to Port Manifold to set up flange of the inert pipe.

4, 1000 to 1030 Coffee time and I saw Chief officer play crosswords.

5, 1030 to 1120 I assisted Second officer to check and change the medicine of first kit in CCR, ECR and galley room.

6, 1120 to 1200 I assisted Gas Engineer to measure the pressure of motor in the motor room.

7, 1300 Mr. Kang and I went to Conference room to study firefighting system.

8, 1500 to 1700 We went to trunk deck to study the dry powder system, there are nine 160kg dry powder and two 1125kg dry powder. And then we went to foam room on the starboard side to study the operational principal.

9, 1800 to 2000 Chief officer , Second officer ,Mr. Kang and I went to help Gas Engineer to set up filter on the Port Manifold., because the company informed us to Change the Portside to get alongside the shore.